Six entrances,
and the work at each.
The systems we install, shown on the kinds of house they were drawn for. Every entry names the opening, the operator and the access control, because that is what a specification should do.

Pollokshields, Glasgow
Victorian gates restored and automated
Ironwork blasted, repaired and gilded, then automated with nothing added to the pillars.
Original wrought iron gates with rusted bottom rails and missing finials. The owners wanted them saved, not replaced, and wanted automation that did not change how they looked.
Gates removed and blasted back to bare metal, new bottom rails and three reproduction finials welded in, hot-dip galvanised and finished in black with gold leaf. DEA GHOST underground operators in drained boxes with 24 V battery backup.
- Age
- c. 1895
- Work
- Blast, repair, galvanise, gild
- Operators
- DEA GHOST 200 underground
- Backup
- 24 V battery

Before, March.

Bothwell, South Lanarkshire
New piers, new gates, same tripod
An open drive on a new-build, closed with a traditional silhouette and none of the upkeep.
After, six weeks later.


Bothwell, South Lanarkshire
New piers, new gates, same tripod
An open drive on a new-build, closed with a traditional silhouette and none of the upkeep.
- Opening
- 3.8 m
- Leaves
- Whitecraigs, RAL 7016
- Operators
- 24 V articulated arm
- Access
- 4G video intercom, remotes
A new-build villa with an open block-paved drive and a timber fence line, older red sandstone villas either side. The owners wanted a traditional shape that would sit with the neighbours, without the upkeep of timber.
New sandstone piers with lantern lights, Whitecraigs arched-top boarded aluminium leaves in anthracite, 24 V articulated arm operators on the inside face and a 4G video intercom. Planting in, drive finished, photographed from the same tripod position six weeks apart.

Giffnock, East Renfrewshire
Cantilever sliding gate on a short drive
A 4 m opening with no room to swing, carried on a cantilever so nothing runs on the ground.
A sloping drive with the house close to the road, so a swing pair would have fouled the tarmac on the way open. The owners wanted the drive usable in the two minutes it takes to unload a car.
A single Cathkin leaf in RAL 7016 aluminium on a cantilever carriage, driven by a Roger brushless motor for near-silent travel. Photocells at two heights and a full-length safety edge on the leading post.
- Opening
- 4.0 m
- Run-off
- 4.6 m
- Motor
- Roger BG30 brushless
- Finish
- RAL 7016 anthracite

Glasgow business park
Car park barrier for a shared office site
Tenant parking by fob, visitors on the intercom, and no queue at nine in the morning.
- Arm
- 4.0 m
- Barrier
- CAME GARD
- Access
- Fobs, timer, video intercom
- Safety
- Loop, photocells, arm skirt
Four tenants sharing sixty spaces, with cars from the retail park next door filling them by half past nine. The managing agent wanted tenant-only parking in the day and open access for evening deliveries.
A CAME GARD barrier with a 4 m arm and a safety loop, fobs for the tenants, a timer that lifts the arm for evening deliveries and a video intercom to reception. A pedestrian gate keeps the footpath clear of the arm.

Finnieston, Glasgow
Door entry for twenty-four flats
One panel at the close and the car park gate on the same system, so one call opens either.
A 1990s audio panel on a Finnieston development of twenty-four flats, with a third of the handsets dead and no way to let a delivery in. The factor wanted video at every door and a panel that would still be serviceable in ten years.
A Videx modular panel in the close with a video monitor in each flat, proximity fobs for residents and a timed release for the bin collection. The gate to the residents' car park runs from the same system, wired back to one cabinet.
- Flats
- 24
- Panel
- Videx 4000 series, video
- Access
- Proximity fobs, timed release
- Car park gate
- Sliding, on the same system

Pollokshields, Glasgow Southside
Privacy gates that keep the piers clean
Kirklee slatted leaves on underground operators, with nothing bolted to the stone.
- Opening
- 4.2 m
- Leaves
- Kirklee slats, RAL 9005
- Operators
- Benincà DU.IT underground
- Access
- 4G video intercom, keypad, app
A blond sandstone villa with new hedging and a clean pair of stone piers. The owners wanted privacy from the road, an intercom they could answer from work, and nothing bolted to the stone.
Kirklee horizontal-slat aluminium leaves in black on Benincà DU.IT underground operators set in drained foundation boxes, a 4G video intercom flush in the left pier, a keypad code for the gardener and the app on both phones.
What every project has in common.
Different houses, different hardware, the same three things at the end of every job.
- Specification
- Written, with model, safety devices, price and lead time
- Handover
- Force test to BS EN 12453, record supplied
- Guarantee
- 12 months workmanship, 10 years finish
Tell us about yours.
Send the details and the engineer who will do the work calls you back, usually within the hour during the day. Free surveys across Greater Glasgow.
Monday to Friday, 8am to 6pm. 24-hour emergency callout, seven days.