Automation that suits the gate, the pillars and the people using it.

Good automation is invisible. The gate opens before you reach it and stops the moment something is in the way. We match the operator to the leaf weight, the pillar geometry and how often the gate is used.

Vertical bar steel swing gates with articulated arm operators on red sandstone piers

Pollokshields. Articulated arm operators on red sandstone piers, 24 V with battery backup.

Underground, arm or sliding: the pillars decide.

The operator type follows the leaf weight, the pillar geometry and how often the gate is used. These are the three we fit most, photographed as they are installed.

Stainless lid of an underground operator box beneath an anthracite gate hinge
Underground

Hidden in a drained foundation box under the hinge. Nothing on the pillar, so stone and listed gateposts stay clean.

Install
2 days with boxes and drainage
Supply
24 V with battery backup
Guide price
from £3,900 a pair
Articulated arm operator on a blond sandstone pillar driving a slatted aluminium leaf
Articulated arm and linear ram

Mounted on the inside face of the pillar. Arms for wide piers and shallow reveals, rams where the geometry is straight.

Install
Most retrofits in 1 day
Leaf
Up to 7 m and 800 kg
Guide price
from £2,450 a pair
Sliding gate motor with rack and pinion along the bottom rail of a bronze slatted leaf
Sliding, rack and pinion

A motor beside the leaf drives a rack along the bottom rail. Brushless for entrances doing hundreds of cycles a day.

Gate
Up to 20 m and 2,000 kg
Speed
9 to 14 m/min
Guide price
from £2,200

What an automation install includes.

Every system is specified in writing, naming the operator model, the safety devices and the access controls, before you say yes.

Underground operators for a completely hidden installation
Articulated arm operators for wide pillars and shallow reveals
Linear ram operators, electromechanical or hydraulic
Rack and pinion sliding gate motors up to 2,000 kg
24 V systems with battery backup for power cuts
Photocells, safety edges, warning lamps and loop detectors
Remotes, keypads, fobs, GSM and smartphone app control
Free-exit loops, timers and holiday modes
Integration with intercoms, electric locks and CCTV
Upgrades of obsolete or unsafe existing automation

Specification

Swing leaf
Up to 7 m and 800 kg per leaf
Sliding gate
Up to 20 m and 2,000 kg
Opening time
12 to 20 s, adjustable
Supply
230 V or 24 V with battery backup
Control
Remote, keypad, GSM, app, loop
Warranty
24 months parts, 12 months labour

Survey visits are free within Greater Glasgow.

Survey to commissioning in four steps.

  1. 01Site surveyWe measure leaves, pillars, reveals and driveway gradient, check the power route and talk through how you actually use the gate. Survey visits are free within Greater Glasgow.
  2. 02Specification and fixed quoteYou get a written specification naming the operator model, safety devices and access controls, with a fixed price and lead time.
  3. 03InstallationMost retrofits are 1 day. Underground operators take 2 days, including the foundation boxes and drainage. Cabling is ducted and the control panel goes in a sealed enclosure.
  4. 04Commissioning and trainingForces are set and tested, safety devices proven, remotes and apps paired, and you are shown the manual release for power cuts.
Engineer levelling an underground operator in its galvanised foundation box beside a red sandstone pier
Pollokshields. Levelling an underground operator in its foundation box before the drainage goes in.

Guide prices for automating gates.

Each includes photocells, a warning lamp and two remotes, installed and force tested. The written specification names the operator model before you commit.

Automate an existing swing gate pairArticulated arm or linear ram kit, photocells, lamp, two remotes, installed.
from £2,450
Underground swing gate automationIncludes foundation boxes, drainage and groundworks.
from £3,900
Automate an existing sliding gateRack and pinion motor, rack, photocells, lamp, two remotes, installed.
from £2,200
Hand entering a code on a stainless keypad set into a sandstone pier

Who makes the operators.

Also BFT, Nice and Sommer where a like-for-like replacement makes sense on an existing installation.

FAACBologna, since 1965

400 series hydraulic rams and the S800 underground for heavy leaves.

CAMETreviso, since 1972

FROG underground, FERNI arms and BX sliding motors, one integrated range.

BenincàSandrigo, since 1979

BOB rams and DU.IT underground, our default on most domestic swing gates.

Roger TechnologyMogliano Veneto, since 2001

Brushless BG30 sliding and R20 underground at 36 V, built for constant use.

DEA SystemVicenza, since 1997

LIVI rams, ANGOLO arms and GHOST underground, strong value throughout.

Before you automate.

The questions we answer at nearly every survey.

Can any gate be automated?

Almost any gate with sound hinges or a straight, level track. Timber gates that have swollen, gates on a steep rising driveway and very light gates in exposed positions need extra thought. We will tell you at the survey if a gate needs strengthening or rehanging first, and we can do that work ourselves.

What is the difference between 24 V and 230 V operators?

24 V systems allow battery backup, softer starts and stops and more precise obstacle detection, so they are our default for domestic gates. 230 V hydraulic operators still make sense for very heavy or intensively used commercial gates.

Will it still work in a power cut?

With a 24 V system and battery backup, yes, for dozens of cycles. Every installation also has a manual release with a key so the gate can be opened by hand.

Do I need planning permission for an automated gate?

Not for automating an existing gate. In Scotland, new gates over two metres high need permission, and over one metre high need permission if they are within 20 metres of a road, and listed buildings and conservation areas have their own rules. We flag this at survey.

Automate the gates you already have.

Send a photograph of the gates and pillars and the rough width of the opening. We will tell you which operator suits and what it costs.

Monday to Friday, 8am to 6pm. 24-hour emergency callout, seven days.

We reply within one working day. No mailing lists.